Canton Division
Layout Plan 8.0
3 December 2006

 

Benchwork

After the encouragement and suggestions of members from TrainBoard.com, I have decided to forge ahead and build my own benchwork as opposed to buying pre-fabricated benchwork.

Benchwork Plan 8.0 Details

Overview

The Main Level will be constructed first.  The main level will be where the majority of the action will take place for the Canton Division.  The entire main level (top level) is the city of Canton.  Located here will be a steel mill complex, grain elevators, flour mill, intermodal facility, and downtown.  Track for the Canton Division is split between Kato Unitrack and Atlas Code 80 Snap Track.  The Kato track is used mainly for the mainlines and hidden areas due to it's bullet proof reliability.  The Atlas track will be used for industrial sidings and yards.  The layout plans show Atlas manual turnouts with the huge levers.  I will be use the discreet manual turnouts from Atlas for it's better looks.

Backdrops
Backdrops will only exist on the wall sides of the layout.  This will be the steel mill complex side and the intermodal yard and Canton Yard.

City of Canton - Main Level 
3 December 2006

Main Level Overview

Steel Mill

Canton Yard

Downtown

 

Town of Bedford - Lower Level

Coming Soon!

Staging Level

Coming Soon!