Canton
Division
Layout Plan 4.0
5 January 2006
This is the layout plans for the Canton Division Layout. These plans
have undergone several revisions and more adjustments are likely. Currently only
the main level has been redesigned. The Lower Level and Staging have not
been designed yet.
LOWER LEVEL PLAN ADDED - 15 January 2006
Benchwork Overview (Main
& Lower Levels)
All Benchwork is
Sievers Benchwork - Not all benchwork is shown

Main Level - 5 JAN 2006
The most prominet change is that the main level now is one city as opposed to seperate scenes as the former layout plans were. This is to depict a very large and industrial city. The entire main level is now the City of Canton.

Backdrops
Backdrops now
will only be along the walls and the back side where the brewery is located.
City of Canton
Intermodal Area (just above Downtown)
Lower Level
Lower Level - Bedford Branch Line
Staging Level