Canton Division
Layout Plan 4.0
5 January 2006
This is the layout plans for the Canton Division Layout.  These plans have undergone several revisions and more adjustments are likely.  Currently only the main level has been redesigned.  The Lower Level and Staging have not been designed yet. 

LOWER LEVEL PLAN ADDED - 15 January 2006

Benchwork Overview (Main & Lower Levels)
All Benchwork is Sievers Benchwork - Not all benchwork is shown

Main Level - 5 JAN 2006

The most prominet change is that the main level now is one city as opposed to seperate scenes as the former layout plans were.  This is to depict a very large and industrial city.  The entire main level is now the City of Canton. 

Backdrops
Backdrops now will only be along the walls and the back side where the brewery is located.

City of Canton 

Downtown

Steel Mill Area

Canton Yard

Intermodal Area (just above Downtown)

Brewery Area

Lower Level

Lower Level - Bedford Branch Line

Staging Level

Coming Soon!