Canton
Division
Layout Plan 3.1
11 October 2005
This is the layout plans for the Canton Division Layout. These plans
have undergone several revisions and more will likely occur. Currently only
the main level has been redesigned. The Lower Level and Staging for
Version
Benchwork Overview (Main
& Lower Levels)
All Benchwork is
Sievers Benchwork

Main Level - 11 October 2005
Major Changes from version 1 series include new benchwork, peninsulas, scenic divider on middle peninsula, more room for long runs, and almost everything else :). Please note that several more structures are to be added to this plan.

Backdrops
Backdrops
(backgrounds) will be used at various locations. Here are the current
details:
Downtown Canton - no backdrop, will be visible from all sides.
Canton - Backdrop will be placed on "Eastern" side
North Canon / North Canton River - Background on North Side
Canton River - Background on scenic divider
Arnold - Background on scenic divider
North Arnold / North Bedford - Backdrop on north side
Bedford - Backdrop on West Side
City of Canton
City of Canton Layout Plan 3.1 - North
City of Canton Layout Plan 3.1 - Center
City of Canton Layout Plan 3.1 - South
City of Canton Layout Plan 3.1 - Downtown
Canton River - Scenic Run
City of Arnold
City of Arnold Layout Plan 3.1 - North
City of Arnold Layout Plan 3.1 - Center
City of Arnold Layout Plan 3.1 - South
City of Bedford
City of Bedford Layout Plan 3.1
Lower Level
Staging Level