Canton Division
Layout Plan 1.2
26 September 2005
This is the layout plans for the Full Canton Division Layout.  These plans have been delayed until I own enough rolling stock, structures, and have enough funds to build all of the benchwork.  In the meantime, the Canton Division - Trial Layout will be built and operated.  At this time, I am expecting to start construction of the Canton Division in 2008 or sooner.

Main Level

Main Level Layout Plan Overview 1.1

Main Level Layout Plan Overview 1.2

Main Level Layout Plan Overview 1.3

City of Canton - Main Level

City of Canton Layout Plan 1.1 - North

City of Canton Layout Plan 1.2 - North

City of Canton Layout Plan 1.3 - North

City of Canton Layout Plan 1.1 - South

City of Canton Layout Plan 1.2 - South

City of Canton Layout Plan 1.3 - South

City of Canton Layout Plan 1.2 - Canton Yard

City of Canton Layout Plan 1.3 - Canton Yard

City of Canton Layout Plan 1.2 - Downtown

 

Mandalyn Mountain Layout Plan 1.1

City of Bedford - Main Level

City of Bedford Layout Plan 1.1

City of Bedford Layout Plan 1.2

Taylor River Layout Plan 1.1

City of Arnold - Main Level

City of Arnold Layout Plan 1.1

City of Arnold Layout Plan 1.2

Desiree Plains Plan 1.1

Upper Level

Upper Level Layout Plan Overiew 1.1

Alyssa Woods

City of Cheyanne

Highland Woods

Lower Level

Lower Level Layout Plan Overview 1.0

City of Marionapolis - Layout Plan 1.0

Davis Badlands - Layout Plan 1.0